Communicate with Supplier? Supplier
Joy Chen Ms. Joy Chen
What can I do for you?
Chat Now Contact Supplier

Jinan Yuanda Power Equipment Co.,Ltd.

All
  • All
  • Title
All
  • All
  • Title
Jinan Yuanda Power Equipment Co.,Ltd.
I agree Bossgoo.com will authorize the transaction payment on Bossgoomall.com. Bossgoomall.com is a subsidiary of Bossgoo.com group, Please rest assured to trade.
I agree
HomeProductsBoiler DrumsBoiler DrumCustomization Drum For Steam Boilers

Customization Drum For Steam Boilers

  • $5000
    1-9
    Set/Sets
  • $4800
    ≥10
    Set/Sets
Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB,CFR,CIF,EXW,FCA,CPT,CIP
Min. Order:
1 Set/Sets
Delivery Time:
30 Days
Transportation:
Ocean,Land,Air
Port:
Qingdao Port,Shanghai Port,Tianjin Port
Share:
Chat Now
  • Product Description
Overview
Product Attributes

Model No.Customization

BrandYDPE

statusNew

warranty period1.5 years

Applicable industryManufacturing Plant, Machinery Repair Shops

Out-of-warranty serviceVideo technical support, Online support, Spare parts

Where to provide local services (in which countries are there overseas service outlets)none

Showroom location (in which countries are there sample rooms overseas)none

Video factory inspectionProvided

Mechanical test reportProvided

Marketing typeOrdinary Product

place of originChina

Types of partsHeating Elements

MaterialCarbon Steel, Alloy Steel

TypeHeating Element

FuelCoal, Oil, Biomass

Delivery TimeWithin 30 Days

StyleSteam Drum

Product NamePower Plant Boiler Parts Drum

StandardGB Standard,

Supply Ability & Additional Informations

PackagingStandard export package

Productivity300T/month

TransportationOcean,Land,Air

Place of OriginChina

Supply Ability300T/month

CertificateSGS

HS Code8402900000

PortQingdao Port,Shanghai Port,Tianjin Port

Payment TypeL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,EXW,FCA,CPT,CIP

Delivery Time30 Days

Packaging & Delivery
Selling Units:
Set/Sets
Package Type:
Standard export package

Product details:


The steam drum is the most important equipment in the boiler equipment, and it is the connecting hub of the three processes of boiler heating, vaporization and overheating, and plays a role of connecting the previous and the next. The water in the boiler turns into qualified superheated steam, which has to go through three processes of heating, vaporization and overheating. The steam drum is related to the above three processes. It needs to receive the water from the economizer; it forms a circulation loop with the evaporation heating surface; the saturated steam is sent to the superheater from the steam drum.



Boiler


As a professional supplier of boiler parts, we have more than 14 years experience in processing and providing boiler parts. We could provide various kinds of boiler parts for industrial boilers. Such as Boiler Economizer, Boiler Water Wall , Boiler Superheater , Boiler Air Preheaters, Boiler Drum, Boiler Headers , boiler Air Nozzle, Boiler Tube Shields , Boiler Grate , boiler fin tube, Boiler Expansion Joint, boiler grate, Boiler Bend, Boiler Auxiliary Equipment, etc. Meanwhile, steam boiler modification technical consultation, OEM and ODM boiler parts processing is also accepted.

drum6

Related products:

Superheater price

Product Processing:


Economizer process

Company Certification:

Economizer certification

Packaging&Shipping:

Economizer package

Contacts:


Economizer contact

Looking for ideal Steam Boiler Drum Tube Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Boiler Drum Price are quality guaranteed. We are China Origin Factory of Steam Boiler Accessories . If you have any question, please feel free to contact us.

Product Categories : Boiler Drums > Boiler Drum

Email to this supplier
  • *To:
    Ms. Joy Chen
  • *Message:
    Your message must be between 20-8000 characters

Home

Phone

About Us

Inquiry